Misty Vale Place

  • Removed all existing roofing, gutters and downspouts; cleaned grounds and dispose all debris
  • Applied synthetic underlayment to entire roof surface prior to roofing application and ice and water shield in valleys and around penetrations
  • Installed five new skylights 2’X4′ additional to existing, included framing, sheet rock installation, mud, tape texture and painting as well as flashing
  • Applied color matching granulated torch down or TPO membrane in dead valley section, included base sheet, step flashing and cap nails
  • Applied Malarkey’s Legacy 50 year product line
  • Installed all new 5″ white aluminum, seamless gutters and downspouts. Altered/redirected the existing downspout on the entry section per homeowners’ discretion

Client Testimonial

“We recommend Integrity roofing to everyone. The value and quality they delivered for the money is significantly better than our two other bids. During the bidding process Integrity Roofing took time to educate us on the latest roofing materials and methods. They made suggestions to improve our roof’s longevity, durability and appearance. The Integrity Roofing team worked fast and performed excellent work. As part of the roof installation we installed new Skylights, they had a dramatic change to the natural light of the rooms. Any of our questions or requests were always followed up immediately. We requested a change to the skylight installation finish work and Integrity Roofing stood by their work and ensured that we were entirely satisfied with the results.”