Steve Williams State Farm Building

  • Installed 1/2″ fan fold insulation with caps and plates to entire roof deck as a thermal barrier to prevent TPO from sweating/condensation
  • Installed 60 mil TPO on entire roof deck. Install caps and plates to TPO and manually weld all seams
  • Installed 140′ of new parapet cap metal in Chestnut Brown (to potentially accent Heather Blend shingle color)
  • Removed all soffit cedar shake, install 1/2″ CDX plywood and install architectural Vista shingle line with hip shingles, starter shingles and eave metal