Lookout Lane

  • Removed and replaced interior sheetrock, mud, tape texture and paint
  • Removed and replaced all tile in the second floor patio sections (2) and installed new membrane system
  • Sheet rock, flooring and some framing removed and replaced as needed

Client Testimonial

Project Gallery