Crystal Springs Drive

  • Temporarily staged plywood and tarps on deck to prevent damage during tear off.
  • Installed jacks and boards for roof loading and installation.
  • Removed all existing roofing, including any clean up with use of magnetic roller for nail pick up in driveways and yard.
  • Applied synthetic underlayment to entire roof surface with  ice and water shield in in valleys and around penetrations.
  • Applied metal to entire perimeter of roof.
  • Removed and replaced existing ventilation with new ridge vent and one RVO vent on back of home, also includes all new pipe boots.
  • Applied Malarkey 40 year Vista shingle product line in Storm Grey.

Client Testimonial

…the representatives of the company are professional, punctual and take the time to carefully explain the roofing material-and their clean up after installation is excellent. The finished product looks fabulous and I will enthusiastically refer them to my friends and clients: thank you Integrity Roofing!

Ana & Joe Richards

Project Gallery